Georgia-Pacific Triad Facility | Bellingham, MA

Georgia-Pacific Triad Facility | Bellingham, Massachusetts

Samiotes Consultants, Inc. completed the “fast track” approvals for the civil engineering design and construction of the New England Distribution/Warehouse Center for Georgia-Pacific Corporation, located in Bellingham.  This project consisted of siting and developing a two-building facility (480,000 gsf) and regional warehouse.  The project included designing a ConRail spur and analyzing whether the existing off-site bridge crossings would impede delivery of oversized rail loads.  Site plan approvals were obtained from both the Bellingham Planning Board and the Bellingham Conservation Commission.  As one of forty-six Triad facilities designed throughout the United States, this was one of only two facilities approved and constructed on time and on budget.

Client/Designer: Georgia-Pacific

back to top...

National Grid | Ayer, Massachusetts

National Grid | Ayer, Massachusetts

Samiotes Consultants Inc. provided civil engineering and land surveying services for the National Grid USA Service Company/New England Hydro-Transmission Electric Company at its Sandy Pond 450k HVDC Converter Terminal located in Ayer. The project provided increased levels of fire protection for this vital converter station between New England and Canada. Samiotes performed both topographic and property line surveys for the project. Samiotes Consultants also designed all civil site improvements for the project, including approximately 2,000 linear feet of water main extension, the site grading and drainage, sanitary sewage connections, and the site erosion controls. 

Client/Designer: Robson Woese Inc.

back to top...

Standard Duplicating | Andover, Massachusetts

Standard Duplicating | Andover, Massachusetts

Samiotes Consultants provided civil engineering and land surveying services for this family-owned business project in Andover. The project consisted of internal reconfiguration of the existing building and expansion/reconfiguration of the parking lot. Municipal approvals were obtained from the Andover Planning Board.  Standard Duplication Machines Corporation, a leading international supplier of duplicating and print finishing solutions, upgraded their Headquarters in Andover to meet the company’s growing needs.  The existing building is to be reconfigured internally with the addition of a mezzanine level above the existing loading area, and the addition of a 900 s.f. cafeteria area on the north side of the building.  In addition to the building improvements, the external parking area is being expanded and updated to accommodate both the needs of the staff and visiting guests.

Client/Designer: Approach Architects

back to top...

ACT Manufacturing Inc. (2 Cabot Rd.) | Hudson, MA

ACT Manufacturing Inc. (2 Cabot Rd.) | Hudson, Massachusetts

Samiotes Consultants’ civil engineering department provided the approvals and contract documents for expanding an existing 100,000 sf building by almost 50,000 sf. This project entailed obtaining waivers for parking and acquiring approvals from the Conservation Commission. The site program included expanding the existing parking facilities and the existing truck dock. For the expansion of the facility, Samiotes successfully illustrated to the Conservation Commission that the existing stormwater management plan had sufficient capacity to accommodate the proposed increased rate of runoff without any modifications to the existing system. In addition, Samiotes Consultants prepared a master site plan for parking demands that illustrated how the site could accommodate the parking requirements of the zoning by-laws. Samiotes then successfully prepared a plan that significantly reduced the required parking in order to meet the actual needs of ACT.  Additionally, Samiotes provided complete land surveying services, including an ALTA/ACSM land title survey and a foundation as-built plan for this 18-acre parcel. 

Client/Designer: Harley Associates

back to top...

UTI Building 200 (1 Upland Rd.) | Norwood, MA

UTI Building 200 (1 Upland Rd.) | Norwood, Massachusetts

Samiotes Consultants provided land surveying services for an addition to the UTI Building 200 located at 1 Upland Road in Norwood. The intent of this project was to monitor twenty-four columns for vertical movement during the construction/addition of a new steel and concrete mezzanine to an existing building. Samiotes also prepared and submitted reports to notify the contractor of site visit findings throughout the duration of the project.

Client/Designer: Chapman Construction Design

back to top...